This weekend my aim was to get the sides of the box finished - First off I added some expanding foam around the sides and back of the box
As you can see in the above pic - the side panels have a little gap - this nees both filling and tieing to the bottom panel That means getting in a brace to join the existing panels together and then adding a 2nd layer of 18mm MDF top and bottom. My workshop for the day
And in the back groung - the workbench every good bass head should have
An 18" sub box!
Any way - I started by cutting some panels wide enough to join over the gaps
And with a little trial and error with the circular saw I managed to accidentaly make the right cuts whislt trying to trim this down
Glued (with pu expanding glue to get into all the gaps) and screwed along the join
Here you can see the accidental deep cut i made that worked well in latching the panel to the ledge of the join - a screw up that actually worked out!
And the 2nd panel added to the front
The centre panel isn't perfect but when the top and bottom are in the centre panel will be filled with fibreglass filler to make a single smooth wall, more on that later
The same was done on the other side
again the 2nd panel isnt perfect but nothign that wont be taken care of with the filler
That was yesterday - I was working on my own so couldn't get much else done - but this morning my dad came round and we measured up for a trip to B and Q to get the MDF for the top and bottom of each side cut - only needed simple cuts so let them do it
A template was made to get the contour right for the back of the panel and transferred to the MDF
And cut out
Once cut to size and test fitted it was covered in PVA and screwed to the side - and anyone that tells you they work with PVA glue and don't cover there hand in it and wait for it to set and peel it off is a liar
The wife is loving the new drill so made swift work of getting the screws in - anyone wanting to to do a stupidly big build like this should get yourself one of these - I couldn't have managed mine without it the drill is pretty good as well
She also makes cracking bacon sarnies and delivers Jupiler at just the right moment!
2nd panel went up nice and quickly
Next up was the tough part - cutting the contours over the arches - Craig made this look easy last week so I stole his pen on a stick Idea to trace the contour of the arches to the MDF and started cutting and managed to do not a bad job - please remember im an IT consultant my day and so this DIY lark is a bit of a stretch for me but im learning as I go along! Covered the back of the board in PVA glue and screwed it on
Needed to make a slight adjustment to the front end of the board to cut a notch out to fit around the centre brace but no problems after that
the same was done on the other side - a little bit of a bigger gap this side but again - filler will sort that!
Once both sides where done we proceeded to give ourselves a headache with some filler
The gap to fill - whoops
And with the weather as it was today - the ice cream van was about so we took a break
The FG filler went in a treat and will be sanded back when finished to give the sides a single smooth wall - we ran out of filler so managed to get most of one side done
With the long weekend coming up I'm hoping to get the roof in place and the fibre-glassing started before it goes to Paul Richardson at A1 Audio Designs to have the door builds and boot door amp rack built.
1 comments: