dB Drag Stats Button

Tuesday, 15 December 2009

A quick pre Xmas Update

Been a while since my last update. so figured I would get one in before the end of the year.

The final equipment list is yet to be determine as I am currently in discussions with a huge potential sponsor which I am very excited about - I cant go into more detail at the moment but keep your eyes peeled and if all goes to plan I will be announcing it on the blog.

The current plan is to get the Shogun/Pajero at the beginning of Jan and make a start stripping it - I have paint already taken care of thanks to Rich Wilson at Unique Body and Paint I also have a pair of 210a alts ready to go in.

I have already purchased a pair of NSB75s which will run off the stock alt to power the full range amps and engine electrics. The main battery bank is looking like its going to consist of 10 or 12 Enersys HX400s (Tech specs HERE) These are very similar to NSB90s - The power supply will stay this spec if the above sponsorship deal goes ahead. That might give you a little clue as to the sort of size system I am hoping to run

As always comments and suggestions please

Also - some people have been asking if the picture on the blog is the car I already own - No its not it is a mock up a friend of mine did in Photoshop to see what a Murdered Out Paj would look like son - here is a bigger version of the pic


I am planning on painting the wheels as well - alot will depend on the final model of Paj I end up with

0 comments:

Post a Comment